Voltage Drop and Cable Selection

How voltage drop is calculated along a run, why the tabulated mV/A/m method exists, and where the practical limits come from.

5 MIN READ3 SECTIONSIncludes diagram

Introduction

A cable must satisfy three separate checks: current-carrying capacity after derating, voltage drop along the run, and protection against fault current. Satisfying one does not satisfy the others.

Voltage drop is usually the check that forces a larger cable on long runs, because it grows linearly with length while current capacity does not.

VloadR cableV(drop) = I × R for DC and resistive single-phase loads
Single-phase circuit: source, cable resistance and load

The tabulated method

Cable tables give a voltage drop figure in millivolts per amp per metre for each conductor size and installation method. Multiply by current and by route length to get the drop in millivolts.

For three-phase circuits the tabulated values already include the √3 factor, which is why the calculation takes the same apparent form as the single-phase one.

Derating comes before voltage drop

Current-carrying capacity is reduced for ambient temperature, grouping, installation method and thermal insulation. AS/NZS 3008.1.1 provides the factors, and the derated capacity must exceed the design current before voltage drop is even considered.

A common error is to select a cable on voltage drop, then find its derated capacity is insufficient for the protective device.

  • Determine design current from the load, including diversity where permitted.
  • Select the protective device, then the cable size that carries the derated current.
  • Check voltage drop over the actual route length, not the straight-line distance.
  • Check that the protective device operates within the maximum disconnection time.

Acceptable limits

The acceptable voltage drop is set by the standard, the electricity distributor and the equipment manufacturer. Limits are normally expressed as a percentage of nominal voltage and are applied to the installation as a whole, not just the final subcircuit.

Sensitive equipment and long motor circuits often impose a tighter limit than the minimum requirement, so the design limit should be confirmed at the start.

[F]Technical formulas

Voltage drop (tabulated method)

V(d) = mV/A/m × I × L

Result in mV; divide by 1 000 for volts.

Voltage drop percentage

V(d)% = V(d) / V(nominal) × 100

Compare with the design limit.

Three-phase resistive drop

V(d) = √3 × I × R × L

For a first estimate; reactance matters on larger cables.

[V]Explanation of variables

SymbolMeaningUnit
IDesign currentA
LRoute lengthm
V(d)Voltage dropV
RConductor resistanceΩ/m

[E]Worked example

100 A over an 80 m three-phase run

  1. 01Take a tabulated value of 1.0 mV/A/m for the candidate cable and installation method.
  2. 02V(d) = 1.0 × 100 × 80 = 8 000 mV = 8.0 V.
  3. 03As a percentage of 400 V: 8.0 / 400 × 100 = 2.0 %.
  4. 04If the design limit is 2 %, this is at the limit; any additional length or current pushes it over.

Result

A 2 % drop at the limit leaves no margin for the subcircuit downstream — the next size up is usually the practical answer.

[A]Practical applications

  • Sizing a submain to a workshop or shed.
  • Checking whether a long extension run will start a motor.
  • Reviewing an electrician’s cable selection.
  • Estimating the effect of relocating equipment further from the board.

[!]Common mistakes

  • Using the straight-line distance instead of the cable route length.
  • Checking voltage drop before applying derating factors.
  • Forgetting that the total installation drop includes the submain and the final subcircuit.
  • Ignoring motor starting current where starting voltage dip matters.

[S]References and sources

  • AS/NZS 3000 – Wiring RulesInstallation requirements including voltage drop provisions.
  • AS/NZS 3008.1.1 – Electrical installations: selection of cablesCurrent-carrying capacity and voltage drop tables and derating factors.

Standards are cited by designation and title only — no clause text is reproduced. Purchase current editions from Standards Australia, and confirm the edition that applies to your project.