Introduction
A bund exists for the failure case: the tank empties, all at once, inside the compound. Sizing it on normal operating volume is the classic error, because the failure case includes the tank’s full contents plus whatever else arrives at the same time.
Freeboard is the same idea applied inside the tank — space reserved so the tank is never liquid-full in service.
Bund capacity
The common requirement is that the bund contain at least 110 % of the capacity of the largest tank, with deductions for the displacement of other tanks standing within the compound. AS 1940 sets the requirements for flammable and combustible liquids; confirm the current edition for the exact provision applying to your installation.
If the compound also receives rainwater or fire water, that volume reduces the available containment unless drainage is controlled by a valve that is closed in normal operation.
Freeboard
Freeboard is the height between the maximum working level and the top of the tank. It accommodates thermal expansion, filling overshoot, foam and wave action during movement.
For a fixed-roof tank it also protects the roof-to-shell junction; for an open tank it prevents overflow onto the bund during filling. Never publish a working capacity that consumes the freeboard.
Detailing that decides whether it works
A bund is only effective if it is impermeable, has no low-level drain left open, and keeps rain out. Liners, coatings and construction joints all need to suit the stored liquid.
Pipe penetrations through the bund wall, and the slope of the compound floor away from the tank, are the two details most often found wanting on inspection.
- Bund floor falls away from the tank so a leak is visible.
- Drain valves are locked closed with controlled procedures for operation.
- Pump plinths and supports inside the bund displace volume — account for them.
- Access stairs, ladders and pipe bridges must not breach the containment.
[F]Technical formulas
Required bund volume
V(bund) ≥ 1.10 × V(largest tank) − displacement
Confirm with AS 1940 for the applicable case.
Bund volume from dimensions
V = L × W × h(effective)
Use the depth below the lowest overflow point.
[V]Explanation of variables
| Symbol | Meaning | Unit |
|---|---|---|
| V(bund) | Usable containment volume | m³ |
| V(tank) | Nominal capacity of the largest tank | m³ |
| h(eff) | Effective depth of the bund | m |
[E]Worked example
Bund for a 10 000 L diesel tank
- 01Required volume = 1.10 × 10 = 11.0 m³.
- 02Allow for a 0.5 m³ pump plinth inside the compound: 11.5 m³ of gross volume needed.
- 03A bund 4.0 m × 3.0 m requires 11.5 / 12 = 0.96 m of effective depth.
- 04Provide 1.0 m depth with the floor falling to a sump, and keep the drain valve locked shut.
Result
A 4 × 3 m compound at 1 m effective depth gives just enough margin once the plinth is counted — a bund sized on the tank alone would be short.
[A]Practical applications
- Designing a fuel or chemical storage compound.
- Checking an existing bund before increasing tank size.
- Preparing an environmental management plan.
- Reviewing spill response provisions for a workshop.
[!]Common mistakes
- Sizing the bund on 100 % of the largest tank without the additional allowance.
- Forgetting the displacement of tanks, plinths and pipe supports inside the bund.
- Leaving the bund drain open so it cannot hold anything.
- Counting nominal tank capacity as working capacity when freeboard is required.
[S]References and sources
- AS 1940 – The storage and handling of flammable and combustible liquidsBunding and separation requirements.
- AS 1692 – Tanks for flammable and combustible liquidsTank construction requirements.
Standards are cited by designation and title only — no clause text is reproduced. Purchase current editions from Standards Australia, and confirm the edition that applies to your project.