[CIVIL]
Asphalt Tonnage Calculator
Asphalt is ordered by the tonne. Enter the paved area and compacted layer thickness to get the volume and mass at the compacted density, with a waste allowance for edges and joints.
Results update as you type. All calculations run in your browser — nothing is uploaded.
Asphalt required
Approximately 0.126 tonne per square metre of pavement.
About this calculator
Asphalt is ordered by the tonne. Enter the paved area and compacted layer thickness to get the volume and mass at the compacted density, with a waste allowance for edges and joints.
What you enter
Paved length in m; Paved width in m; Compacted thickness in mm; Asphalt density in kg/m³; Waste allowance in %. Every result is recalculated in the browser as you type.
Also searched as
- asphalt
- tonnage
- pavement
- tarmac
- seal
- tonne
- compaction
One of the civil engineering tools on Engineering Toolbox Australia. Inputs and results use Australian metric units with imperial equivalents where noted.
Frequently asked questions
Asphalt is ordered by the tonne. Enter the paved area and compacted layer thickness to get the volume and mass at the compacted density, with a waste allowance for edges and joints. With the default inputs it reports asphalt required in tonne, compacted mass in tonne, volume in m³.
Results are for preliminary estimating and study. Verify against the applicable Australian Standard and have final designs certified by a suitably qualified engineer.
Asphalt required
Approximately 0.126 tonne per square metre of pavement.
Related tools
Related reading
